Roof Edge Protection & Guardrail
Perimeter guardrail and edge protection for roofers, solar installers and anyone working near a fall risk. We install and certify the system before your crew goes up, because a fall from a single storey is enough to end a career.
What this job includes.
- ✓Perimeter roof guardrail for pitched and flat roofs
- ✓Edge protection for solar, gutter and re-roof work
- ✓Catch platforms and void protection
- ✓Fast install-and-strike for short-duration roof jobs
- ✓Certified and tagged before handover, inspected for the hire period
The same 7 lines, every time.
Whatever the surface, your quote splits the work the same honest way, so you can see exactly what you’re paying for.
- 1 Design + duty rating. Engineered to the load your trades carry, light, medium or heavy, not guessed.
- 2 Engineer design certificate. Required over four metres or for any non-standard load. Signed, not assumed.
- 3 SWMS, before boots. A job-specific safe-work method statement, on site before anyone climbs.
- 4 Erect + dismantle, fixed. Both priced on the page, with a firm install date and a dismantle date.
- 5 Weekly hire rate. A clear per-week rate and the included weeks, so there is no surprise hire creep.
- 6 Green Scaftag handover. A dated tag on every access point, so anyone on site knows it is certified.
- 7 Public protection. Gantry, hoarding, debris netting where the job meets the footpath or the street.
What happens, step by step.
Site survey + access plan
We measure, photograph, note the loads, the ground and where the job meets the street.
Engineered design + certificate
Designed to AS/NZS 1576 and certified by an engineer for anything over four metres.
SWMS + firm install date
The safe-work method statement and a date you can build your trades around.
Install + tagged handover
Built to spec, handed over on a green Scaftag, and walked through with you.
Weekly inspections
Documented every seven days and after any alteration, impact or weather event.
Dismantle + site clear
Struck on the agreed date, gear off your site, ground swept behind us.
The paperwork behind the price.
SafeWork NSW SB-00000, Public liability to $20M, and a engineer-certified handover workmanship warranty, all in writing, all on request.
Dan walks through exactly what’s covered, the licence you can verify, the cover that protects your home, and the warranty that names its own exclusions instead of hiding them.
Roof Edge Protection & Guardrail jobs we’ve done.
Roof Edge Protection & Guardrail, common questions.
Can you install before my roofers start?
Does edge protection suit a short job?
Is guardrail enough, or do I need full scaffold?
Read more before you book
Get a free site assessment and a fixed erect-and-dismantle quote you can actually read.
Tell us about the job. We’ll survey the site, design the access and send a quote with the hire, the certificate and the inspections all on the page.