Commercial · Builders & PMs

Commercial & Multi-Storey Scaffolding

Access for builders, project managers and facilities teams. We deliver a designed, certified scaffold with the paperwork your principal contractor needs: a design certificate over four metres, a SWMS, handover tags per stage and a weekly inspection register that survives an audit.

Commercial & Multi-Storey Scaffolding job
Scope

What this job includes.

  • Multi-storey perimeter and access scaffold, designed and engineer-certified
  • Staged erect and dismantle aligned to your program
  • Loading bays, material hoists and rubbish chutes
  • Public protection: gantries, hoarding and overhead protection decks
  • Full documentation pack: design cert, SWMS, handover tags, inspection register
Our system: Ringlock and Kwikstage to AS/NZS 1576, with an engineered design certificate for any scaffold over four metres or carrying a non-standard load.
How we quote it

The same 7 lines, every time.

Whatever the surface, your quote splits the work the same honest way, so you can see exactly what you’re paying for.

The scaffold scope sheet
  1. 1 Design + duty rating. Engineered to the load your trades carry, light, medium or heavy, not guessed.
  2. 2 Engineer design certificate. Required over four metres or for any non-standard load. Signed, not assumed.
  3. 3 SWMS, before boots. A job-specific safe-work method statement, on site before anyone climbs.
  4. 4 Erect + dismantle, fixed. Both priced on the page, with a firm install date and a dismantle date.
  5. 5 Weekly hire rate. A clear per-week rate and the included weeks, so there is no surprise hire creep.
  6. 6 Green Scaftag handover. A dated tag on every access point, so anyone on site knows it is certified.
  7. 7 Public protection. Gantry, hoarding, debris netting where the job meets the footpath or the street.
If a quote doesn’t show these lines, you can’t compare it, and you don’t know what’s been cut.
How it runs

What happens, step by step.

1

Site survey + access plan

We measure, photograph, note the loads, the ground and where the job meets the street.

2

Engineered design + certificate

Designed to AS/NZS 1576 and certified by an engineer for anything over four metres.

3

SWMS + firm install date

The safe-work method statement and a date you can build your trades around.

4

Install + tagged handover

Built to spec, handed over on a green Scaftag, and walked through with you.

5

Weekly inspections

Documented every seven days and after any alteration, impact or weather event.

6

Dismantle + site clear

Struck on the agreed date, gear off your site, ground swept behind us.

Licensed, covered, warranted

The paperwork behind the price.

SafeWork NSW SB-00000, Public liability to $20M, and a engineer-certified handover workmanship warranty, all in writing, all on request.

Dan walks through exactly what’s covered, the licence you can verify, the cover that protects your home, and the warranty that names its own exclusions instead of hiding them.

The licence, the cover, the warranty, and how to check each one.
Proof, recent work

Commercial & Multi-Storey Scaffolding jobs we’ve done.

Before
After
Warehouse-to-apartments perimeter, Surry Hills. Five-level engineered perimeter, loading bay, staged to the build program. Design certified.
Before
After
Multi-storey commercial scaffold, Parramatta. Engineered access with material hoist and rubbish chute. Weekly inspection register emailed.
Questions, answered

Commercial & Multi-Storey Scaffolding, common questions.

Do you provide a design certificate and SWMS?
Yes. Any scaffold over four metres gets an engineered design certificate, and every job ships with a job-specific SWMS before we set foot on site. Your principal contractor gets the pack, not a promise.
Can you work to our construction program?
We plan erect and dismantle stages around your trades and your float. You get firm dates, staged handovers per level, and a single coordinator who answers the phone.
How is the scaffold inspected once it is up?
We inspect and document every seven days, and after any alteration, weather event or impact. The register lives on site and is emailed to your site manager, so the audit trail is never a scramble.
Get started

Get a free site assessment and a fixed erect-and-dismantle quote you can actually read.

Tell us about the job. We’ll survey the site, design the access and send a quote with the hire, the certificate and the inspections all on the page.

✓ SafeWork NSW licensed✓ Insured to $20M✓ Engineer-certified design✓ 89 five-star reviews✓ Built to AS/NZS 1576
Get a quote Call